here’s the back of the house and the siding we need to finish. As you can see, it is a challenge. There is still work to do (the highest points)but it has been windy around here to do it. But, it was nice to get the blue foam covered up – it looks finished from [...]
2009 April
Here’s the kids bathroom tile – working on the floor next.
Pictures! Floor travertine stone for the master bath floor. Not sure when we’ll get to the tub and shower. At least we are working on flooring – floors are good.
I’ll be posting more pictures (when I post, I post – sorry for the delay again) but here is a start! Progress….!!! Here is the laundry room and spare bathroom.
Here’s some recent pics of Fibber and Sleeves that I promised their first mama Sarah. Sleeves is the one with the sock – he seems to always want something in his mouth, either a toy or sock. I shaved them on Good Friday and boy, they really needed it! Sleeves I still have to work [...]
We went to Utah on Sunday, March 30th since kids had their doc apt. Monday afternoon. We took the Suburban. The weather held up til we got there, then it started snowing. We went further than Salt Lake to Roy, UT hoping to try this famous drive in which was closed! Then we headed back [...]